Odell Wind Project

Description

Wanzek was the EPC contractor for this project. The Odell Wind Project included two substations; one 34.5:115kV step-up substation with two transformer bays and nine open air collection feeder circuits and one 115:345kV step-up substation with a single transformer bay and a 5-step 125MVAR 115kV capacitor bank.

Scope

  • EPC services
  • Foundations
  • Steel erection
  • Equipment installation
  • Relay installation and settings
  • Control terminations and testing

Location

Minnesota