NDDOT Bridge Construction

Description

Wanzek Construction, Inc. was hired to work on the demolition and replacement of two bridges south of Beulah, ND on US Hwy 49. The first bridge constructed was a single span 106’ bridge over Brush Creek. The second bridge constructed was a three span 288’ bridge over the Knife River.

Scope

  • Structure removals
  • Excavation
  • Steel piling
  • Reinforcing steel
  • Substructure Concrete
  • Prestressed Concrete I-Beams
  • Superstructure Concrete
  • Approach Slabs

Location

Mercer County, ND