Frontier Wind Project

Description

Wanzek Construction, Inc. was contracted as the EPC contractor to construct the Frontier Wind project. The 200 MW project utilized 61, Vestas V126 3.3 MW turbines. Frontier was the first wind farm to utilize the V126 turbine in the United States.

Scope

  • Civil and foundation engineering and installation
  • Collection system installation
  • Transmission line installation
  • Turbine offload and erection activities

Location

Kay County, OK