Description

Wanzek was the EPC contractor for this project. Eclipse Wind is a 200.1 MW wind farm consisting of 88 Siemens 2.3MW turbines and will interconnect with a transmission system at a 34.SkV to 345kV interconnection substation. The scope of work included 20.8 miles of roads and 41,263 CY of concrete.

Scope

  • Turbine Erection
  • Foundations
  • Collection System
  • SCADA
  • Substation System
  • Transmission Lines
  • O&M Building

Location

Iowa