Eclipse Wind
Description
Wanzek was the EPC contractor for this project. Eclipse Wind is a 200.1 MW wind farm consisting of 88 Siemens 2.3MW turbines and will interconnect with a transmission system at a 34.SkV to 345kV interconnection substation. The scope of work included 20.8 miles of roads and 41,263 CY of concrete.
Scope
- Turbine Erection
- Foundations
- Collection System
- SCADA
- Substation System
- Transmission Lines
- O&M Building
Location
Iowa