Desert Wind Project

Description

Wanzek Construction, Inc. was hired to construct the first large scale wind project in the state of North Carolina. The project consisted of 104 Gamesa G-114 93M HH near Elizabeth City, NC. Wanzek's scope included the construction of 327,000 lf of access roads to all turbine locations. Installation of the foundations included installation of rammed stone columns and, at each location, dewatering systems. Roughly 19 of the turbine locations were located in wooded areas, which required deforesting and stump removal. The project site used one Manitowoc 16000 and four Liebherr LR 1750 cranes to complete the turbine installation activities.

Scope

  • Civil
  • SWPPP
  • Rammed stone columns
  • Concrete foundations
  • Turbine Installation
  • Turbine Wiring
  • O&M Building

Location

Perquimans and Pasquotank Counties, North Carolina