Briscoe Wind Project

Description

Wanzek was the EPC contractor for this project. The Briscoe Wind project included a 34.5:115kV step-up substation with a single transformer bay, six open air collection feeder circuits and a single step 34.5kV 15MVAR capacitor bank.

Scope

  • EPC services
  • Foundations
  • Steel erection
  • Equipment
  • Installation
  • Relay Installation and Settings
  • Control Terminations and Testing

Location

Texas